Aquarius Ground System
Contents
Mission System Description
Requirements
- Level-1 Requirements and Mission Success Criteria - 28 September 2005
- Level-2A Aquarius Science Requirements - 21 July 2008
- Level-2B Aquarius/SAC-D Mission System Requirements - 18 May 2009
- Level-3 AQ Science Algorithm Requirements - 10 June 2008
- Level-3 Aquarius Validation Data Segment Requirements - 12 June 2008
Documentation
Aquarius/SAC-D Mission Plan - March 1, 2011
Aquarius Ground Segment - Common Elements
Interface Diagram (ADPS and ACCS)
GSFC-managed Documents
SAC-D Ground System to Aquarius Ground System ICD - April 1, 2011
- Aquarius Ground System – Aquarius Instrument Team Anomaly ICD - January 20, 2011
Aquarius Ground System Integration Test & Training Plan - September 8, 2011
Aquarius Validation Data Segment to Data Processing Segment ICD - April 30, 2011
Aquarius Mission Operations Anomaly Reporting and Resolution Process - November 7, 2011
Aquarius Science Team - Aquarius Ground System ICD - January 19, 2011
SAC-D Network Requirements Document- September 14, 2010 - September 14, 2015
JPL-managed Documents
- Level-3 Aquarius Ground System and Test Requirements - May 26, 2011
- Aquarius JPL to GSFC Operations Transition Plan - May 23, 2011
- Aquarius Ground System to PO.DAAC ICD - April 15, 2011
- Level-3 Science Algorithm Document - May 16, 2011
- Aquarius Commissioning Plan - March 22, 1011
Most Recent Reviews
- PreCDR - Aquarius Command and Control System (ACCS) - March 2008
- PreCDR - NASA Ground Network Support for SAC-D - March 2008
- Mission CDR - NASA Ground System Presentation - July 2008
- Mission Operations Review - February 2010
- Aquarius Data Processing System Status (ADPS)
- Aquarius Command and Control System Status(ACCS)
- Aquarius Launch and Commissioning Operations
- Delta Mission Operations Review - November 2010
- Aquarius Ground System Update (ADPS and ACCS)
Aquarius Data Processing System (ADPS)
Software
Software Development via Mission Simulation - General overview of data flow and processing
Software upgrades made as part of Mission Simulation - updated May 23, 2011
Software upgrades made post launch - updated May 23, 2013
Documentation
- Plans
- Format Documents
Level‑1A Data Product - February 22, 2012
Level‑2 Data Product - V2.0 - February 12, 2013
Level‑3 Standard Mapped Image Product - June 4, 2010
- Algorithm Theoretical Basis Documents and Software User Guides
Version 2: Algorithm Theoretical Basis Document Aquarius Salinity Retrieval Algorithm - Frank J. Wentz and David M. Le Vine - August 29, 2012
Addendum to ATBD - D. Le Vine, T. Meissner, F. Wentz and J. Piepmeier - August 30, 2012
Counts to TA calibration document - Jeffrey Piepmeier - April 28, 2010
- Aquarius Scatterometer Science Processing Software (L1a to L2) User Manual - November 30, 2010 (ITAR-restricted)
Aquarius Level-3 gridding Algorithm Theoretical Basis Document - February 2009
Presentations
- Science Meetings
- Aquarius Algorithm Workshops
Aquarius Command and Control System (ACCS)
ACCS Development and Testing
In-House Tools
- Mission Operations Tools for Telemetry Monitoring and Aquarius Products
- Aquarius Telemetry from ATLO Campaign
- Reporting and Tracking Tool
- Configuration Tracking Tool
- Subversion Software and Documentation Repositories
- Analysis Tool
- Command Planning Tool (v2.11)
Documentation
- Aquarius Command and Control System (ACCS) Software Management Plan - March 16, 2011
External Tools
- Telemetry Viewer Scripts and Pages
- Scheduler Client
Mission Operations Development and Testing
Requirements
- Aquarius Mission Operations Requirements Document - September 2009
Operations Procedures
- ACCS Command Planning Procedure - October 2011
- ACCS Data Monitoring Procedure - October 2011
Testing
- Operations Tests
- Mission Scenarios
- Operational Readiness Test
Documentation
- Aquarius Flight Operations Plan - September 20, 2011
- Aquarius Instrument Operations Handbook - March 2, 2010
- SAC-D/Aquarius Joint Anomalies Resolution Process (in review)
- Aquarius/SAC-D Joint Configuration Management Procedure - (in review)
- SAC-D MOC - ACCS Joint Configuration Item Control Change Procedure (in review)
- Aquarius Joint Configuration Management Process

