Aquarius Ground System

Mission System Description

Requirements

  1. Level-1 Requirements and Mission Success Criteria - 28 September 2005
  2. Level-2A Aquarius Science Requirements - 21 July 2008
  3. Level-2B Aquarius/SAC-D Mission System Requirements - 18 May 2009
  4. Level-3 AQ Science Algorithm Requirements - 10 June 2008
  5. Level-3 Aquarius Validation Data Segment Requirements - 12 June 2008

Documentation

  1. Aquarius/SAC-D Mission Plan - March 1, 2011

Aquarius Ground Segment - Common Elements

  1. Interface Diagram (ADPS and ACCS)

GSFC-managed Documents

  1. SAC-D Ground System to Aquarius Ground System ICD - April 1, 2011

  2. Aquarius Ground System – Aquarius Instrument Team Anomaly ICD - January 20, 2011
  3. Aquarius Ground System Integration Test & Training Plan - September 8, 2011

  4. Aquarius Validation Data Segment to Data Processing Segment ICD - April 30, 2011

  5. Aquarius Mission Operations Anomaly Reporting and Resolution Process - November 7, 2011

  6. Aquarius Science Team - Aquarius Ground System ICD - January 19, 2011

  7. SAC-D Project Service Level Agreement - FY11

  8. SAC-D Network Requirements Document- September 14, 2010 - September 14, 2015

JPL-managed Documents

  1. Level-3 Aquarius Ground System and Test Requirements - May 26, 2011
  2. Aquarius JPL to GSFC Operations Transition Plan - May 23, 2011
  3. Aquarius Ground System to PO.DAAC ICD - April 15, 2011
  4. Level-3 Science Algorithm Document - May 16, 2011
  5. Aquarius Commissioning Plan - March 22, 1011

Most Recent Reviews

  1. PreCDR - Aquarius Command and Control System (ACCS) - March 2008
  2. PreCDR - NASA Ground Network Support for SAC-D - March 2008
  3. Mission CDR - NASA Ground System Presentation - July 2008
  4. Mission Operations Review - February 2010
    • Aquarius Data Processing System Status (ADPS)
    • Aquarius Command and Control System Status(ACCS)
    • Aquarius Launch and Commissioning Operations
  5. Delta Mission Operations Review - November 2010
    • Aquarius Ground System Update (ADPS and ACCS)

Aquarius Data Processing System (ADPS)

Software

  1. Software Development via Mission Simulation - General overview of data flow and processing

Documentation

  1. Plans
  2. Format Documents
  3. Algorithm Theoretical Basis Documents and Software User Guides

Presentations

  1. Science Meetings
  2. Aquarius Algorithm Workshops

Aquarius Command and Control System (ACCS)

ACCS Development and Testing

In-House Tools

  1. Mission Operations Tools for Telemetry Monitoring and Aquarius Products
  2. Reporting and Tracking Tool
  3. Alarm and Error Notification System

  4. Configuration Tracking Tool
    • Subversion Software and Documentation Repositories
  5. Analysis Tool
  6. Command Planning Tool (v2.11)

Documentation

  1. Aquarius Command and Control System (ACCS) Software Management Plan - March 16, 2011

External Tools

  1. Telemetry Viewer Scripts and Pages
  2. Scheduler Client

Mission Operations Development and Testing

Requirements

  1. Aquarius Mission Operations Requirements Document - September 2009

Operations Procedures

  1. ACCS Command Planning Procedure - October 2011
  2. ACCS Data Monitoring Procedure - October 2011

Testing

  1. Operations Tests
    • Mission Scenarios
    • Operational Readiness Test

Documentation

  1. Aquarius Flight Operations Plan - September 20, 2011
  2. Aquarius Instrument Operations Handbook - March 2, 2010
  3. SAC-D/Aquarius Joint Anomalies Resolution Process (in review)
  4. Aquarius/SAC-D Joint Configuration Management Procedure - (in review)
  5. SAC-D MOC - ACCS Joint Configuration Item Control Change Procedure (in review)
  6. Aquarius Joint Configuration Management Process

Curator: OceanColor Webmaster

Authorized by: gene carl feldman

NASA logo

Privacy Policy and Important Notices

Updated: 23 May 2013